Railway Engineering The treadle bar is provided in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of both the rails near and parallel to inner side of one of the rails at right angle to the rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following factors govern the choice of the gauge ? i) volume and nature of traffic ii) speed of train iii) physical features of the country The correct answer is (i), (ii) and (iii) both (ii) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) both (ii) and (iii) both (i) and (ii) only (i) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided are i) 2 obtuse angle crossings ii) 4 obtuse angle crossings iii) 4 acute angle crossings iv) 6 acute angle crossings The correct answer is (i) and (iii) (ii) and (iv) (ii) and (iii) (i)and(iv) (i) and (iii) (ii) and (iv) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 1,3,2,4 1,3,4,2 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Wear of rails is maximum in weight of coastal area sharp curve tunnels tangent track coastal area sharp curve tunnels tangent track ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be sec A cot A tan A Arad sec A cot A tan A Arad ANSWER DOWNLOAD EXAMIANS APP