Railway Engineering The load on each axle of a locomotive is 22 tonnes. If the coefficient of friction is 0.2, then the hauling capacity due to 3 pairs of driving wheels will be 13.21 26.41 19.81 6.61 13.21 26.41 19.81 6.61 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a scissors cross-over, the crossings provided are i) 2 obtuse angle crossings ii) 4 obtuse angle crossings iii) 4 acute angle crossings iv) 6 acute angle crossings The correct answer is (i)and(iv) (ii) and (iv) (ii) and (iii) (i) and (iii) (i)and(iv) (ii) and (iv) (ii) and (iii) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of A to B Will be more in the direction of B to A Will be maximum at the middle of A and B Cannot be determined from the given data Will be more in the direction of A to B Will be more in the direction of B to A Will be maximum at the middle of A and B Cannot be determined from the given data ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 12 1 in 20 1 in 8’/2 1 in 16 1 in 12 1 in 20 1 in 8’/2 1 in 16 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Due to battering action of wheels over the end of the rails, the rails get bent down and are deflected at ends. These rails are called Buckled rails Roaring rails Corrugated rails Hogged rails Buckled rails Roaring rails Corrugated rails Hogged rails ANSWER DOWNLOAD EXAMIANS APP