Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is both (i) and (ii) only (i) (i), (ii) and (iii) both (i) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) both (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The shape of transition curve used by Indian Railways is sine curve lemniscate of Bernoulli spiral cubic parabola sine curve lemniscate of Bernoulli spiral cubic parabola ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch toe of the switch to the theoretical nose of crossing heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The total gap on both sides between the inside edges of wheel flanges and gauge faces of the rail is kept as 19 mm 16 mm 10 mm 13 mm 19 mm 16 mm 10 mm 13 mm ANSWER DOWNLOAD EXAMIANS APP