Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) (i)and(iv) (i) and (ii) (ii) and (iii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The main function of a fish plate is To join the two rails together To allow rail to expand and contract freely None of these To join rails with the sleeper To join the two rails together To allow rail to expand and contract freely None of these To join rails with the sleeper ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be more in the direction of A to B Will be maximum at the middle of A and B Will be more in the direction of B to A Cannot be determined from the given data Will be more in the direction of A to B Will be maximum at the middle of A and B Will be more in the direction of B to A Cannot be determined from the given data ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Cant deficiency occurs when a vehicle travels around a curve at Speeds lower than equilibrium speed Booked speed Speeds higher than equilibrium speed Equilibrium speed Speeds lower than equilibrium speed Booked speed Speeds higher than equilibrium speed Equilibrium speed ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 963 975 985 900 963 975 985 900 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP