Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The nominal size of ballast used for points and crossings is 40 mm 25 mm 50 mm 10 mm 40 mm 25 mm 50 mm 10 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Cannot be determined from the given data Will be more in the direction of A to B Will be more in the direction of B to A Will be maximum at the middle of A and B Cannot be determined from the given data Will be more in the direction of A to B Will be more in the direction of B to A Will be maximum at the middle of A and B ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering One degree of curve is equivalent to (where R is the radius of curve in meters.) 1850/R 1700/R 1750/R 1600/R 1850/R 1700/R 1750/R 1600/R ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 12 16 8 4 12 16 8 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 975 900 985 963 975 900 985 963 ANSWER DOWNLOAD EXAMIANS APP