Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) (i)and(iv) (ii) and (iii) (iii) and (iv) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct 1 and 4 are correct I and 2 are correct 2 and 3 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The slipping of driving wheels of locomotives on the rail surface causes hogging of rails corrugation of rails scabbing of rails wheel burns hogging of rails corrugation of rails scabbing of rails wheel burns ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Head width of 52 kg rail section is 66.7 mm 61.9 mm 72.33 mm 67 mm 66.7 mm 61.9 mm 72.33 mm 67 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 4 8 16 12 4 8 16 12 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle is the angle between the outer face of the stock rail and the gauge face of the tongue rail the gauge face of the stock rail and outer face of the tongue rail the gauge face of the stock rail and tongue rail the outer face of the stock rail and tongue rail the outer face of the stock rail and the gauge face of the tongue rail the gauge face of the stock rail and outer face of the tongue rail the gauge face of the stock rail and tongue rail the outer face of the stock rail and tongue rail ANSWER DOWNLOAD EXAMIANS APP