Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1353 552 783 1588 1353 552 783 1588 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is only (i) (ii) and (iii) (i)and(ii) (i), (ii) and (iii) only (i) (ii) and (iii) (i)and(ii) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Fish plate is in contact with rail at foot of rail fishing plane web of rail head of rail foot of rail fishing plane web of rail head of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 2 6 4 5 2 6 4 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Heel divergence is Sometimes greater than flange-way clearance Always less than flange-way clearance Equal to flange-way clearance Always greater than flange-way clearance Sometimes greater than flange-way clearance Always less than flange-way clearance Equal to flange-way clearance Always greater than flange-way clearance ANSWER DOWNLOAD EXAMIANS APP