Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 552 783 1353 1588 552 783 1353 1588 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Two important constituents in the composition of steel used for rail are Manganese and phosphorous Carbon and manganese Carbon and silicon Carbon and sulphur Manganese and phosphorous Carbon and manganese Carbon and silicon Carbon and sulphur ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A treadle bar is used for interlocking points and signal setting marshalling yard signals track maintenance setting points and crossings interlocking points and signal setting marshalling yard signals track maintenance setting points and crossings ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 73 71 72 70 73 71 72 70 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The formation width for a railway track depends on the i) type of gauge ii) number of tracks to be laid side by side iii) slope of sides of embankment or cutting The correct answer is both (i) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) both (i) and (iii) both (i) and (ii) only (i) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP