Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 1,3,2,4 3,1,2,4 1,3,4,2 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Dog spikes are used for fixing rail to the CST-9 sleepers concrete sleepers steel trough sleepers wooden sleepers CST-9 sleepers concrete sleepers steel trough sleepers wooden sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when semaphore arm lowered but warner arm horizontal both arms are horizontal both semaphore and warner arms lowered None of these semaphore arm lowered but warner arm horizontal both arms are horizontal both semaphore and warner arms lowered None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Increase the vertical stiffness Increase the lateral strength Avoid the stress concentration Reduce the wear Increase the vertical stiffness Increase the lateral strength Avoid the stress concentration Reduce the wear ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed None of these stop proceed cautiously proceed None of these stop proceed cautiously ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep.i) Creep is greater on curves than on tangent railway track,ii) Creep in new rails is more than that in old rails,iii) Creep is more on steep gradients than on level track.The correct answer is only (i) (i)and(ii) (i), (ii) and (iii) (ii) and (iii) only (i) (i)and(ii) (i), (ii) and (iii) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP