Railway Engineering Number offish bolts per fish plate is 4 2 6 5 4 2 6 5 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the rail for 52 kg rail section is 187 mm 189 mm 162 mm 156 mm 187 mm 189 mm 162 mm 156 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its web head and foot both foot head web head and foot both foot head ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Lead of crossing is the distance from the toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing toe of the switch to the theoretical nose of crossing toe of the switch to the actual nose of crossing heel of the switch to the toe of the switch heel of the switch to the theoretical nose of the crossing ANSWER DOWNLOAD EXAMIANS APP