Railway Engineering Fish plate is in contact with rail at head of rail web of rail fishing plane foot of rail head of rail web of rail fishing plane foot of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Increase the lateral strength Reduce the wear Increase the vertical stiffness Avoid the stress concentration Increase the lateral strength Reduce the wear Increase the vertical stiffness Avoid the stress concentration ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The sleepers resting directly on girder are fastened to the top flange of girder by fang bolts dog spikes rail screws hook bolts fang bolts dog spikes rail screws hook bolts ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Creep is the Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail Longitudinal movement of rail Difference in level of two rails Vertical movement of rail Lateral movement of rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The standard length of rail for Broad Gauge and Meter Gauge are respectively 12 m and 13 m 13 m and 13 m 13 m and 12 m 12 m and 12 m 12 m and 13 m 13 m and 13 m 13 m and 12 m 12 m and 12 m ANSWER DOWNLOAD EXAMIANS APP