Railway Engineering In a scissors cross-over, the crossings provided arei) 2 obtuse angle crossingsii) 4 obtuse angle crossingsiii) 4 acute angle crossingsiv) 6 acute angle crossingsThe correct answer is (i) and (iii) (ii) and (iii) (i)and(iv) (ii) and (iv) (i) and (iii) (ii) and (iii) (i)and(iv) (ii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Largest percentage of material in the rail is in its head foot web head and foot both head foot web head and foot both ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 1,3,4,2 1,3,2,4 3,1,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 70 72 73 71 70 72 73 71 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? point lock detectors iock bar stretcher bar point lock detectors iock bar stretcher bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The purpose of providing fillet in a rail section is to Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration Reduce the wear Increase the lateral strength Increase the vertical stiffness Avoid the stress concentration Reduce the wear ANSWER DOWNLOAD EXAMIANS APP