Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 60 cm 75 cm to 80 cm 70 cm 80 cm 60 cm 75 cm to 80 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall None of these Cement concrete in foundation R.C.C. structure Hollow concrete block wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed All of these At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar In thin slabs, 12 mm minimum or diameter of the bar whichever is more For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more All of these At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar In thin slabs, 12 mm minimum or diameter of the bar whichever is more For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ 3.5 m³ 2.5 m³ 1.5 m³ 5.0 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is None of these 10 cm 20 cm 15 cm None of these 10 cm 20 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick edging Reinforced brick work Broken glass coping Brick work in arches Brick edging Reinforced brick work Broken glass coping Brick work in arches ANSWER DOWNLOAD EXAMIANS APP