Estimating and Costing The measurement is not made in square meters in case of R.C. Chhajja P.C. (Damp proof course) Form works Concrete Jeffries R.C. Chhajja P.C. (Damp proof course) Form works Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface excavation Surface dressing Cutting Excavation Surface excavation Surface dressing Cutting Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of (A) and (B) of the above Columns, lintels, copings Wall facing Building work (A) and (B) of the above Columns, lintels, copings Wall facing Building work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) B × d - Sd1/2 Bd + Sd2 B + d + Sd ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Brick work in arches Brick edging Broken glass coping Reinforced brick work Brick work in arches Brick edging Broken glass coping Reinforced brick work ANSWER DOWNLOAD EXAMIANS APP