Estimating and Costing While preparing a detailed estimate Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum Area should be measured correct to 0.01 sqm All of these Dimension should be measured correct to 0.01 m Volume should be measured correct to 0.01 cum Area should be measured correct to 0.01 sqm All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 1.00 cum 4.00 cum 3.00 cum 2.00 cum 1.00 cum 4.00 cum 3.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm 20 cm 10 cm None of these 15 cm 20 cm 10 cm None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient All of these At every change of direction At every 30 m intervals At every change of gradient All of these At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP