Estimating and Costing Brick walls are measured in sq. m if the thickness of the wall is 15 cm None of these 10 cm 20 cm 15 cm None of these 10 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Height, breadth, length None of these Length, breadth, height Breadth, length, height Height, breadth, length None of these Length, breadth, height Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Berms are provided in canals if these are Fully in embankment Fully in excavation Partly in excavation and partly in embankment All of these Fully in embankment Fully in excavation Partly in excavation and partly in embankment All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 2.00 cum 3.00 cum 1.00 cum 4.00 cum 2.00 cum 3.00 cum 1.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm 5.0 sqm 7.5 sqm 10 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 2.5 m³ 5.0 m³ 1.5 m³ 3.5 m³ 2.5 m³ 5.0 m³ 1.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP