Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm 7.5 sqm 10 sqm 5.0 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 26,500 m³ 26,000 m³ 27,500 m³ 27,000 m³ 26,500 m³ 26,000 m³ 27,500 m³ 27,000 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings Wall facing Building work (A) and (B) of the above Columns, lintels, copings Wall facing Building work (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 4.00 cum 3.00 cum 1.00 cum 2.00 cum 4.00 cum 3.00 cum 1.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Cost of fittings and their fixing is specified for the following sanitary fittings Lavatory basins Flushing pipes All listed here Water closets Lavatory basins Flushing pipes All listed here Water closets ANSWER DOWNLOAD EXAMIANS APP