Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: The water seal is less than that of ordinary traps It is provided a cleaning eye at the top of the trap It is provided in between the lower end of the house drain and the street sewer The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe The water seal is less than that of ordinary traps It is provided a cleaning eye at the top of the trap It is provided in between the lower end of the house drain and the street sewer The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.98 m³ 0.90 m³ 1.00 m³ 0.94 m³ 0.98 m³ 0.90 m³ 1.00 m³ 0.94 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Honey comb brick work All of these Brick flat soling Half brick walls or the partition Honey comb brick work All of these Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Wall thickness Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 1.00 cum 2.00 cum 4.00 cum 3.00 cum 1.00 cum 2.00 cum 4.00 cum ANSWER DOWNLOAD EXAMIANS APP