Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the incorrect statement regarding a master trap from the following: It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided a cleaning eye at the top of the trap It is provided in between the lower end of the house drain and the street sewer The water seal is less than that of ordinary traps The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe It is provided a cleaning eye at the top of the trap ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.025 0.02 0.05 0.04 0.025 0.02 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work All of these Brickwork, Stone work, Roofing Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm 25 cm x 13 cm x 7.5 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 30 minutes 40 minutes 25 minutes 20 minutes 30 minutes 40 minutes 25 minutes ANSWER DOWNLOAD EXAMIANS APP