Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more In thin slabs, 12 mm minimum or diameter of the bar whichever is more All of these At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.75 1 0.5 0.25 0.75 1 0.5 0.25 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these One fourth breadth of wall on each side Breadth of the wall Half breadth of wall on each side None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.04 sqm 0.02 sqm 0.01 sqm 0.03 sqm 0.04 sqm 0.02 sqm 0.01 sqm 0.03 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 14° 10° 12° 8° 14° 10° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Meter for length Liter for capacity Square meters for volume Cubic metre for area Meter for length Liter for capacity Square meters for volume ANSWER DOWNLOAD EXAMIANS APP