Anti-siphonage pipe is connected to

Bottom of P trap W.C.
Main soil pipe
Side of water closet
Top of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For the construction of buildings, the subheads of the estimate are

Brickwork Flooring, Wood work, Steel work
Earthwork, Concrete work, Brick work
Brickwork, Stone work, Roofing
All of these

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The slope of the outlet of 'P trap' below the horizontal is kept

12°
10°
8°
14°

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

50 D
59 D
39 D
30 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is

B × d - Sd1/2
½ (Bd + Sd2)
B + d + Sd
Bd + Sd2

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The following item of earth work is not measured separately.

Setting out of works
Steps in deep excavation
All listed here
Site clearance

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑