Estimating and Costing Anti-siphonage pipe is connected to Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Cleats Brackets Bolts All listed here Cleats Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made in square metre in case of Hollow concrete block wall R.C.C. structure Cement concrete in foundation None of these Hollow concrete block wall R.C.C. structure Cement concrete in foundation None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum All of these Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm Volume should be measured correct to 0.01 cum All of these Dimension should be measured correct to 0.01 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 70 cm 75 cm to 80 cm 60 cm 80 cm 70 cm 75 cm to 80 cm 60 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3250 m³ 3300 m³ 3225 m³ 3275 m³ 3250 m³ 3300 m³ 3225 m³ 3275 m³ ANSWER DOWNLOAD EXAMIANS APP