Estimating and Costing Anti-siphonage pipe is connected to Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing All of these Brickwork Flooring, Wood work, Steel work Earthwork, Concrete work, Brick work Brickwork, Stone work, Roofing All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 12° 10° 8° 14° 12° 10° 8° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 50 D 59 D 39 D 30 D 50 D 59 D 39 D 30 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B × d - Sd1/2 ½ (Bd + Sd2) B + d + Sd Bd + Sd2 B × d - Sd1/2 ½ (Bd + Sd2) B + d + Sd Bd + Sd2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance ANSWER DOWNLOAD EXAMIANS APP