Estimating and Costing Pick up the correct statement in case of water supply. All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality All of these Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately Pipes are classified according to their sizes and quality ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 3.5 m³ 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ 5.0 m³ 2.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 4.0 m2 1.5 m2 5.0 m2 2.0 m2 4.0 m2 1.5 m2 5.0 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Trapezoidal formula Prismoidal formula Mid-section formula All of these Trapezoidal formula Prismoidal formula Mid-section formula All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Reinforced brick work Brick work in arches Brick edging Broken glass coping Reinforced brick work Brick work in arches Brick edging Broken glass coping ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level Lift and wall including landing ANSWER DOWNLOAD EXAMIANS APP