Estimating and Costing Pick up the correct statement in case of water supply. Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these Cutting through walls and floors are included with the item Pipes are classified according to their sizes and quality Pipes laid in trenches and pipes fixed to walls are measured separately All of these Cutting through walls and floors are included with the item ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3250 m³ 3300 m³ 3225 m³ 3275 m³ 3250 m³ 3300 m³ 3225 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 12° 10° 14° 8° 12° 10° 14° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ 0.200 m³ 0.295 m³ 0.274 m³ 0.247 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Honey comb brick work All of these Brick flat soling Half brick walls or the partition Honey comb brick work All of these Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP