Estimating and Costing The brick work is not measured in cu m in case of Reinforced brick work One or more than one brick wall Half brick wall Brick work in arches Reinforced brick work One or more than one brick wall Half brick wall Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and None of these Breadth of the wall One fourth breadth of wall on each side Half breadth of wall on each side None of these Breadth of the wall One fourth breadth of wall on each side Half breadth of wall on each side ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these Intermediate points having abrupt change in gradient Right angle to the centre line 30 meters apart All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 1.00 m³ 0.90 m³ 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ 0.94 m³ 0.98 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is All listed here Brackets Bolts Cleats All listed here Brackets Bolts Cleats ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) d × d × s L.D √(1 + s²) √[d² × (ds)²] 2 L.D √(1 + s²) d × d × s ANSWER DOWNLOAD EXAMIANS APP