Estimating and Costing In the mid-section formula The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The area of mid-sections is calculated by using mean depth The mean depth is the average of depths of two consecutive sections All of these The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is 0.247 m³ 0.200 m³ 0.274 m³ 0.295 m³ 0.247 m³ 0.200 m³ 0.274 m³ 0.295 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings All of these Circular buildings Hexagonal buildings Octagonal buildings All of these Circular buildings Hexagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction At every 30 m intervals All of these At every change of gradient At every change of direction At every 30 m intervals All of these At every change of gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 200 mm 175 mm 100 mm 150 mm 200 mm 175 mm 100 mm ANSWER DOWNLOAD EXAMIANS APP