Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(s - r) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Building work Columns, lintels, copings (A) and (B) of the above Wall facing Building work Columns, lintels, copings (A) and (B) of the above Wall facing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries Form works P.C. (Damp proof course) R.C. Chhajja Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Cutting Surface dressing Surface excavation Excavation Cutting Surface dressing Surface excavation Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Hexagonal buildings Circular buildings All of these Octagonal buildings Hexagonal buildings Circular buildings All of these Octagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3300 m³ 3225 m³ 3250 m³ 3275 m³ 3300 m³ 3225 m³ 3250 m³ ANSWER DOWNLOAD EXAMIANS APP