Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Cubic metre for area Square meters for volume Meter for length Liter for capacity Cubic metre for area Square meters for volume Meter for length Liter for capacity ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Lift and wall including landing Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Lift and wall including landing Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation All of these Earth work in excavation Rock cutting Excavation in trenches for foundation All of these Earth work in excavation Rock cutting ANSWER DOWNLOAD EXAMIANS APP