Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying All of these Connection to drains Bed concreting Setting and laying All of these Connection to drains Bed concreting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The volume is measured correct to the nearest 0.01 cum 0.02 cum 0.04 cum 0.03 cum 0.01 cum 0.02 cum 0.04 cum 0.03 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While preparing a detailed estimate Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m Area should be measured correct to 0.01 sqm All of these Volume should be measured correct to 0.01 cum Dimension should be measured correct to 0.01 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 80 cm 70 cm 75 cm 90 cm 80 cm 70 cm 75 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is B + d + Sd Bd + Sd2 B × d - Sd1/2 ½ (Bd + Sd2) B + d + Sd Bd + Sd2 B × d - Sd1/2 ½ (Bd + Sd2) ANSWER DOWNLOAD EXAMIANS APP