Estimating and Costing

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

All of these
Bed concreting
Setting and laying
Connection to drains

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

0.274 m³
0.295 m³
0.200 m³
0.247 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Pick up the item of work not included in the plinth area estimate

W' Area
Wall thickness
Room area
Courtyard area

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

27,500 m³
26,500 m³
27,000 m³
26,000 m³

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
Anti-siphonage pipe is connected to

Top of P trap W.C.
Main soil pipe
Side of water closet
Bottom of P trap W.C.

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of direction
At every change of gradient
At every 30 m intervals
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑