Estimating and Costing The rate of an item of work depends on Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. Side of water closet Main soil pipe Bottom of P trap W.C. Top of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ 0.90 m³ 0.98 m³ 1.00 m³ 0.94 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 27,000 m³ 26,000 m³ 26,500 m³ 27,500 m³ 27,000 m³ 26,000 m³ 26,500 m³ 27,500 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.01 sqm 0.02 sqm 0.04 sqm 0.03 sqm 0.01 sqm 0.02 sqm 0.04 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 8° 14° 12° 10° 8° 14° 12° ANSWER DOWNLOAD EXAMIANS APP