Estimating and Costing The rate of an item of work depends on All of these Specifications of works Proportion of mortar Specifications of materials All of these Specifications of works Proportion of mortar Specifications of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 500 m3 2000 m3 1000 m3 1500 m3 500 m3 2000 m3 1000 m3 1500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Setting and laying Connection to drains Bed concreting All of these Setting and laying Connection to drains Bed concreting ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Anti-siphonage pipe is connected to Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. Main soil pipe Side of water closet Top of P trap W.C. Bottom of P trap W.C. ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 175 mm 200 mm 100 mm 150 mm 175 mm 200 mm 100 mm 150 mm ANSWER DOWNLOAD EXAMIANS APP