Estimating and Costing The brick work is measured in sq metre, in case of Brick flat soling All of these Honey comb brick work Half brick walls or the partition Brick flat soling All of these Honey comb brick work Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating the qualities for the construction of a building, the correct metric unit is Liter for capacity Square meters for volume Meter for length Cubic metre for area Liter for capacity Square meters for volume Meter for length Cubic metre for area ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes All of these Bed concreting Connection to drains Setting and laying All of these Bed concreting Connection to drains Setting and laying ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Quantity of the materials Availability of materials Transportation of materials All of these Quantity of the materials Availability of materials Transportation of materials All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.02 0.05 0.025 0.04 0.02 0.05 0.025 0.04 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The correct Prismoidal formula for volume is D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] D/6 [first area + last area + 2 ∑ Even area + 4 ∑ odd areas] D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] ANSWER DOWNLOAD EXAMIANS APP