Estimating and Costing The damp proof course (D.P.C.) is measured in Meters Cub. m None of these Sq. m Meters Cub. m None of these Sq. m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Prismoidal formula All of these Trapezoidal formula Mid-section formula Prismoidal formula All of these Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Honey comb brick work All of these Brick flat soling Half brick walls or the partition Honey comb brick work All of these Brick flat soling Half brick walls or the partition ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 5.0 m2 4.0 m2 1.5 m2 2.0 m2 5.0 m2 4.0 m2 1.5 m2 2.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.02 0.05 0.025 0.04 0.02 0.05 0.025 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called All listed here Master trap Intercepting trap Interception manhole All listed here Master trap Intercepting trap Interception manhole ANSWER DOWNLOAD EXAMIANS APP