Estimating and Costing The most reliable estimate is Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate Preliminary estimate Detailed estimate Cube rate estimate Plinth area estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 27,000 m³ 26,000 m³ 27,500 m³ 26,500 m³ 27,000 m³ 26,000 m³ 27,500 m³ 26,500 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall Half brick wall Reinforced brick work Brick work in arches One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Wall panels Root slabs Floors All of these Wall panels Root slabs Floors All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 500 m3 1000 m3 1500 m3 2000 m3 500 m3 1000 m3 1500 m3 ANSWER DOWNLOAD EXAMIANS APP