Estimating and Costing Size, capacity and materials need be specified for Bib-cocks Ball valves All of these Stop-cocks Bib-cocks Ball valves All of these Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Wall panels Floors Root slabs All of these Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 1.00 cum 3.00 cum 4.00 cum 2.00 cum 1.00 cum 3.00 cum 4.00 cum 2.00 cum ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is Availability of materials All of these Transportation of materials Quantity of the materials Availability of materials All of these Transportation of materials Quantity of the materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to Indian Standards Institute, the actual size of modular bricks is 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm 23 cm x 11.5 cm x 7.5 cm 20 cm x 10 cm x 10 cm 25 cm x 13 cm x 7.5 cm 19 cm x 9 cm x 9 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters Expanded metal wire netting M.S. reinforcement of R.C.C. works Collapsible gates with rails Rolling shutters Expanded metal wire netting ANSWER DOWNLOAD EXAMIANS APP