Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 8° 10° 14° 12° 8° 10° 14° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.02 sqm 0.04 sqm 0.01 sqm 0.03 sqm 0.02 sqm 0.04 sqm 0.01 sqm 0.03 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The most reliable estimate is Detailed estimate Plinth area estimate Cube rate estimate Preliminary estimate Detailed estimate Plinth area estimate Cube rate estimate Preliminary estimate ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is measured in sq metre, in case of Half brick walls or the partition Brick flat soling All of these Honey comb brick work Half brick walls or the partition Brick flat soling All of these Honey comb brick work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In the mid-section formula The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The mean depth is the average of depths of two consecutive sections All of these The area of mid-sections is calculated by using mean depth The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections The mean depth is the average of depths of two consecutive sections All of these The area of mid-sections is calculated by using mean depth ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended 150 mm 100 mm 200 mm 175 mm 150 mm 100 mm 200 mm 175 mm ANSWER DOWNLOAD EXAMIANS APP