Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 14° 8° 10° 12° 14° 8° 10° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 10 sqm 5.0 sqm 7.5 sqm 2.5 sqm 10 sqm 5.0 sqm 7.5 sqm 2.5 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Carpet area does not include the area of All of these Kitchen and pantry The walls along with doors and other openings Bath room and lavatory All of these Kitchen and pantry The walls along with doors and other openings Bath room and lavatory ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap Master trap Interception manhole All listed here Intercepting trap Master trap Interception manhole All listed here ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 1.00 m³ 0.90 m³ 0.98 m³ 0.94 m³ 1.00 m³ 0.90 m³ 0.98 m³ 0.94 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.35 for 20 users 1.80 liters for 5 to 10 users All of these 1.20 liters for 15 users 1.35 for 20 users 1.80 liters for 5 to 10 users All of these 1.20 liters for 15 users ANSWER DOWNLOAD EXAMIANS APP