Estimating and Costing The slope of the outlet of 'P trap' below the horizontal is kept 10° 8° 14° 12° 10° 8° 14° 12° ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Cleats All listed here Brackets Bolts Cleats All listed here Brackets Bolts ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Prismoidal formula All of these Mid-section formula Trapezoidal formula Prismoidal formula All of these Mid-section formula Trapezoidal formula ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Setting and laying Bed concreting All of these Connection to drains Setting and laying Bed concreting All of these Connection to drains ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item of work not included in the plinth area estimate Room area Courtyard area W' Area Wall thickness Room area Courtyard area W' Area Wall thickness ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works All listed here Site clearance Steps in deep excavation Setting out of works All listed here Site clearance Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP