Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction All of these At every change of gradient At every 30 m intervals At every change of direction All of these At every change of gradient At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ 0.94 m³ 0.98 m³ 1.00 m³ 0.90 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 26,500 m³ 26,000 m³ 27,000 m³ 27,500 m³ 26,500 m³ 26,000 m³ 27,000 m³ 27,500 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters All of these Root slabs Wall panels Floors All of these Root slabs Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Octagonal buildings Circular buildings All of these Hexagonal buildings Octagonal buildings Circular buildings All of these Hexagonal buildings ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users ANSWER DOWNLOAD EXAMIANS APP