Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of gradient At every 30 m intervals At every change of direction All of these At every change of gradient At every 30 m intervals At every change of direction All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing While estimating a reinforced cement structure, the omitted cover of concrete is assumed In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more In thin slabs, 12 mm minimum or diameter of the bar whichever is more At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar All of these For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users 1.20 liters for 15 users 1.35 for 20 users All of these 1.80 liters for 5 to 10 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-sections for a highway is taken at All of these Intermediate points having abrupt change in gradient 30 meters apart Right angle to the centre line All of these Intermediate points having abrupt change in gradient 30 meters apart Right angle to the centre line ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved. 27,000 m³ 26,500 m³ 27,500 m³ 26,000 m³ 27,000 m³ 26,500 m³ 27,500 m³ 26,000 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.25 1 0.5 0.75 0.25 1 0.5 0.75 ANSWER DOWNLOAD EXAMIANS APP