Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system At every change of direction At every 30 m intervals All of these At every change of gradient At every change of direction At every 30 m intervals All of these At every change of gradient ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing For the construction of buildings, the subheads of the estimate are Brickwork, Stone work, Roofing All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work Brickwork, Stone work, Roofing All of these Earthwork, Concrete work, Brick work Brickwork Flooring, Wood work, Steel work ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 20 minutes 25 minutes 30 minutes 40 minutes 20 minutes 25 minutes 30 minutes 40 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of the brick structure measured in sq.m, is Reinforced brick work Brick edging Broken glass coping Brick work in arches Reinforced brick work Brick edging Broken glass coping Brick work in arches ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The 'centre line method' is specially adopted for estimating Circular buildings Octagonal buildings Hexagonal buildings All of these Circular buildings Octagonal buildings Hexagonal buildings All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d L + (2 × 0.42 d) L - (0.42 d) L - (2 × 0.4 d) L + 0.42 d ANSWER DOWNLOAD EXAMIANS APP