Estimating and Costing In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and One fourth breadth of wall on each side Half breadth of wall on each side None of these Breadth of the wall One fourth breadth of wall on each side Half breadth of wall on each side None of these Breadth of the wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 1000 m3 1500 m3 500 m3 2000 m3 1000 m3 1500 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The floor area includes the area of the balcony up to 0.75 1 0.5 0.25 0.75 1 0.5 0.25 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) L - (0.42 d) L + (2 × 0.42 d) L + 0.42 d L - (2 × 0.4 d) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the excavation where measurements are made in square meters for payment. Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Both (B) and (C) Surface excavation up to 30 cm depths Ordinary cuttings up to 1 m Surface dressing up to 15 cm depths Both (B) and (C) Surface excavation up to 30 cm depths ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The height of the sink of wash basin above floor level is kept 80 cm 60 cm 75 cm to 80 cm 70 cm 80 cm 60 cm 75 cm to 80 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP