Estimating and Costing The measurement is made in square metre in case of R.C.C. structure None of these Cement concrete in foundation Hollow concrete block wall R.C.C. structure None of these Cement concrete in foundation Hollow concrete block wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 75 cm 70 cm 90 cm 80 cm 75 cm 70 cm 90 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ 5.0 m³ 2.5 m³ 3.5 m³ 1.5 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The trap which is provided to disconnect the house drain from the street sewer is called Intercepting trap Master trap All listed here Interception manhole Intercepting trap Master trap All listed here Interception manhole ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the correct statement in case of water supply. Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately All of these Pipes are classified according to their sizes and quality Cutting through walls and floors are included with the item Pipes laid in trenches and pipes fixed to walls are measured separately All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 15) chains None of these (6 + 18) chains (6 + 12) chains (6 + 15) chains None of these (6 + 18) chains (6 + 12) chains ANSWER DOWNLOAD EXAMIANS APP