Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is (6 + 15) chains (6 + 12) chains (6 + 18) chains None of these (6 + 15) chains (6 + 12) chains (6 + 18) chains None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The main factor to be considered while preparing a detailed estimate, is All of these Quantity of the materials Transportation of materials Availability of materials All of these Quantity of the materials Transportation of materials Availability of materials ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(s - r) ⅓ × (b - rd)²/(r - s) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of an item of work depends on Specifications of works Specifications of materials All of these Proportion of mortar Specifications of works Specifications of materials All of these Proportion of mortar ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Wall panels Floors Root slabs All of these Wall panels Floors Root slabs All of these ANSWER DOWNLOAD EXAMIANS APP