Estimating and Costing According to ISI method of measurement, the order of the sequence is None of these Breadth, length, height Height, length, breadth Length, breadth, height None of these Breadth, length, height Height, length, breadth Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The minimum width of a septic tank is taken 90 cm 80 cm 70 cm 75 cm 90 cm 80 cm 70 cm 75 cm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of P.C. (Damp proof course) Form works R.C. Chhajja Concrete Jeffries P.C. (Damp proof course) Form works R.C. Chhajja Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The item of steel work which is measured in sq.m, is Ventilators and glazing Rolling shutters All listed here Collapsible gates Ventilators and glazing Rolling shutters All listed here Collapsible gates ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 40 minutes 25 minutes 30 minutes 20 minutes 40 minutes 25 minutes 30 minutes 20 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users 1.35 for 20 users All of these 1.20 liters for 15 users 1.80 liters for 5 to 10 users 1.35 for 20 users ANSWER DOWNLOAD EXAMIANS APP