Estimating and Costing According to ISI method of measurement, the order of the sequence is Length, breadth, height Height, length, breadth None of these Breadth, length, height Length, breadth, height Height, length, breadth None of these Breadth, length, height ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is Length, breadth, height Height, breadth, length Breadth, length, height None of these Length, breadth, height Height, breadth, length Breadth, length, height None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The weight of an item is measured correct to nearest 0.50 kg 1.00 kg 0.75 kg 0.25 kg 0.50 kg 1.00 kg 0.75 kg 0.25 kg ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ⅓ × (b - rd)²/(s - r) ½ × (b + rd)²/(r - s) ⅓ × (b - rd)²/(r + s) ⅓ × (b - rd)²/(r - s) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of half brick partition wall per mason per day is 2.0 m2 1.5 m2 4.0 m2 5.0 m2 2.0 m2 1.5 m2 4.0 m2 5.0 m2 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works Steps in deep excavation All listed here Site clearance Setting out of works Steps in deep excavation All listed here Site clearance ANSWER DOWNLOAD EXAMIANS APP