Estimating and Costing The concrete work for the following part of the building of specified thickness is measured in square meters Root slabs All of these Wall panels Floors Root slabs All of these Wall panels Floors ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Brick work in arches Reinforced brick work Half brick wall One or more than one brick wall Brick work in arches Reinforced brick work Half brick wall One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The unit of measurement is per quintal for the following: M.S. reinforcement of R.C.C. works Collapsible gates with rails Expanded metal wire netting Rolling shutters M.S. reinforcement of R.C.C. works Collapsible gates with rails Expanded metal wire netting Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is made for stone work in square metre in case of Columns, lintels, copings Building work (A) and (B) of the above Wall facing Columns, lintels, copings Building work (A) and (B) of the above Wall facing ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3275 m³ 3225 m³ 3250 m³ 3300 m³ 3275 m³ 3225 m³ 3250 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Pick up the item whose weight is added to the weight of respective item, is Bolts Cleats All listed here Brackets Bolts Cleats All listed here Brackets ANSWER DOWNLOAD EXAMIANS APP