Estimating and Costing The unit of measurement is per quintal for the following: Collapsible gates with rails M.S. reinforcement of R.C.C. works Expanded metal wire netting Rolling shutters Collapsible gates with rails M.S. reinforcement of R.C.C. works Expanded metal wire netting Rolling shutters ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as Surface dressing Surface excavation Cutting Excavation Surface dressing Surface excavation Cutting Excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Size, capacity and materials need be specified for All of these Bib-cocks Ball valves Stop-cocks All of these Bib-cocks Ball valves Stop-cocks ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Rock cutting Excavation in trenches for foundation Earth work in excavation All of these Rock cutting Excavation in trenches for foundation Earth work in excavation All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 5.0 sqm 2.5 sqm 10 sqm 7.5 sqm 5.0 sqm 2.5 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The order of booking dimensions is None of these Height, breadth, length Breadth, length, height Length, breadth, height None of these Height, breadth, length Breadth, length, height Length, breadth, height ANSWER DOWNLOAD EXAMIANS APP