Estimating and Costing The unit of measurement is per quintal for the following: M.S. reinforcement of R.C.C. works Expanded metal wire netting Rolling shutters Collapsible gates with rails M.S. reinforcement of R.C.C. works Expanded metal wire netting Rolling shutters Collapsible gates with rails ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.04 0.025 0.02 0.05 0.04 0.025 0.02 0.05 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing According to ISI method of measurement, the order of the sequence is Breadth, length, height Height, length, breadth Length, breadth, height None of these Breadth, length, height Height, length, breadth Length, breadth, height None of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) 2 L.D √(1 + s²) √[d² × (ds)²] d × d × s L.D √(1 + s²) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The area is measured correct to the nearest 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm 0.03 sqm 0.04 sqm 0.01 sqm 0.02 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is 3225 m³ 3275 m³ 3250 m³ 3300 m³ 3225 m³ 3275 m³ 3250 m³ 3300 m³ ANSWER DOWNLOAD EXAMIANS APP