Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 8.0 sq m 4.0 sq m 2.5 sq m 6.0 sq m 8.0 sq m 4.0 sq m 2.5 sq m 6.0 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The following item of earth work is not measured separately. Setting out of works All listed here Site clearance Steps in deep excavation Setting out of works All listed here Site clearance Steps in deep excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: Length of long wall out-to-out is 6.80 m All listed here Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m Length of long wall out-to-out is 6.80 m All listed here Length of short walls in-to-in is 3.20 m The total length of centre line of four walls is 20 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch Area of the walls at the floor level Internal shaft for sanitary installations up to 2 sq m. in area Lift and wall including landing Area of cantilevered porch Area of the walls at the floor level ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn of 2.5 cm cement concrete floor per mansion per day 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm 7.5 sqm 2.5 sqm 5.0 sqm 10 sqm ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing In case of laying gullies, siphons, intercepting traps, the cost includes Bed concreting All of these Setting and laying Connection to drains Bed concreting All of these Setting and laying Connection to drains ANSWER DOWNLOAD EXAMIANS APP