Estimating and Costing The expected out turn of 12 mm plastering with cement mortar is 4.0 sq m 6.0 sq m 8.0 sq m 2.5 sq m 4.0 sq m 6.0 sq m 8.0 sq m 2.5 sq m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken 1.20 liters for 15 users 1.80 liters for 5 to 10 users All of these 1.35 for 20 users 1.20 liters for 15 users 1.80 liters for 5 to 10 users All of these 1.35 for 20 users ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The inspection pit or chamber is a manhole provided in a base drainage system All of these At every change of gradient At every change of direction At every 30 m intervals All of these At every change of gradient At every change of direction At every 30 m intervals ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries Form works R.C. Chhajja P.C. (Damp proof course) Concrete Jeffries ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The assumption on which the trapezoidal formula for volumes is based, is The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied The mid-area of a pyramid is half the average area of the ends The end sections are parallel planes All listed here The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The expected out turn for earth work in excavation in ordinary soil per workman per day is 3.00 cum 2.00 cum 4.00 cum 1.00 cum 3.00 cum 2.00 cum 4.00 cum 1.00 cum ANSWER DOWNLOAD EXAMIANS APP