Estimating and Costing The following item of earth work is not measured separately. All listed here Steps in deep excavation Setting out of works Site clearance All listed here Steps in deep excavation Setting out of works Site clearance ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The plinth area of a building not includes Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level Lift and wall including landing Internal shaft for sanitary installations up to 2 sq m. in area Area of cantilevered porch Area of the walls at the floor level ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The detention period in a septic tank is assumed 40 minutes 25 minutes 20 minutes 30 minutes 40 minutes 25 minutes 20 minutes 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The measurement is not made in square meters in case of Form works R.C. Chhajja Concrete Jeffries P.C. (Damp proof course) Form works R.C. Chhajja Concrete Jeffries P.C. (Damp proof course) ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Referring of given figure, pick up the correct statement from the following: The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m The total length of centre line of four walls is 20 m Length of short walls in-to-in is 3.20 m All listed here Length of long wall out-to-out is 6.80 m ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The brick work is not measured in cu m in case of Brick work in arches Half brick wall Reinforced brick work One or more than one brick wall Brick work in arches Half brick wall Reinforced brick work One or more than one brick wall ANSWER DOWNLOAD EXAMIANS APP