Estimating and Costing If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is 50 D 30 D 39 D 59 D 50 D 30 D 39 D 59 D ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The rate of payment is made for 100 cu m (per % cu m) in case of Excavation in trenches for foundation All of these Rock cutting Earth work in excavation Excavation in trenches for foundation All of these Rock cutting Earth work in excavation ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds 0.025 0.02 0.05 0.04 0.025 0.02 0.05 0.04 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by Mid-section formula Trapezoidal formula Prismoidal formula All of these Mid-section formula Trapezoidal formula Prismoidal formula All of these ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is 2000 m3 1500 m3 1000 m3 500 m3 2000 m3 1500 m3 1000 m3 500 m3 ANSWER DOWNLOAD EXAMIANS APP
Estimating and Costing The damp proof course (D.P.C.) is measured in Sq. m Meters None of these Cub. m Sq. m Meters None of these Cub. m ANSWER DOWNLOAD EXAMIANS APP