Estimating and Costing

Estimating and Costing
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is

39 D
59 D
50 D
30 D

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The inspection pit or chamber is a manhole provided in a base drainage system

At every change of direction
At every 30 m intervals
All of these
At every change of gradient

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The main factor to be considered while preparing a detailed estimate, is

Availability of materials
All of these
Transportation of materials
Quantity of the materials

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
While estimating the qualities for the construction of a building, the correct metric unit is

Liter for capacity
Cubic metre for area
Meter for length
Square meters for volume

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
In case of laying gullies, siphons, intercepting traps, the cost includes

All of these
Setting and laying
Bed concreting
Connection to drains

ANSWER DOWNLOAD EXAMIANS APP

Estimating and Costing
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

3.5 m³
1.5 m³
2.5 m³
5.0 m³

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Estimating and Costing

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑