Construction Planning and Management Construction team means An engineer An architect All listed here An owner An engineer An architect All listed here An owner ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Which one of the following is not an excavating and moving type of equipment? Bulldozer Clam shell Scraper Dump truck Bulldozer Clam shell Scraper Dump truck ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management The time corresponding to minimum total project cost is Between normal time and crash time Normal time Crash time Optimistic time Between normal time and crash time Normal time Crash time Optimistic time ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management The process of incorporating changes and rescheduling or replanning is called Resource smoothening Resource levelling Updating Critical path scheduling Resource smoothening Resource levelling Updating Critical path scheduling ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle? Firm earth Asphalt Concrete Loose sand Firm earth Asphalt Concrete Loose sand ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as Independent float Free float Interfering float Total float Independent float Free float Interfering float Total float ANSWER DOWNLOAD EXAMIANS APP