Construction Planning and Management Construction team means An owner An engineer All listed here An architect An owner An engineer All listed here An architect ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Latest start of an activity is always equal to latest event time of preceding node less than latest event time of preceding node greater than or equal to latest event time of preceding node less than or equal to latest event time of preceding node equal to latest event time of preceding node less than latest event time of preceding node greater than or equal to latest event time of preceding node less than or equal to latest event time of preceding node ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Consider the following statements:In the critical path method of construction planning, Free Float can be.1. Greater than Total Float.2. Greater than Independent Float3. Equal to Total Float.4. Less than Independent Float 2 and 3 are correct 1 and 4 are correct 1 and 2 are correct 1 and 4 are correct 2 and 3 are correct 1 and 4 are correct 1 and 2 are correct 1 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management While filling the tender for any work, the contractor considers Availability of labour Availability of construction materials All listed here Site survey Availability of labour Availability of construction materials All listed here Site survey ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management Slack time refers to None of these An activity An event Both event and activity None of these An activity An event Both event and activity ANSWER DOWNLOAD EXAMIANS APP
Construction Planning and Management PERT technique of network analysis is mainly useful for Small projects Large and complex projects Research and development projects Deterministic activities Small projects Large and complex projects Research and development projects Deterministic activities ANSWER DOWNLOAD EXAMIANS APP