Railway Engineering The purpose of providing fillet in a rail section is to Increase the vertical stiffness Avoid the stress concentration Increase the lateral strength Reduce the wear Increase the vertical stiffness Avoid the stress concentration Increase the lateral strength Reduce the wear ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Normally maximum cant permissible in Meter Gauge is 140 mm 75 mm 90 mm 165 mm 140 mm 75 mm 90 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 2 1 3 None of these 2 1 3 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Dog spikes are used for fixing rail to the CST-9 sleepers steel trough sleepers wooden sleepers concrete sleepers CST-9 sleepers steel trough sleepers wooden sleepers concrete sleepers ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 4 6 2 5 4 6 2 5 ANSWER DOWNLOAD EXAMIANS APP