Highway Engineering In case of hill roads, the extra widening is generally provided fully on the outer side of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the inner side of the curve equally on inner and outer sides of the curve fully on the outer side of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the inner side of the curve equally on inner and outer sides of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Catch-water drain Cross drain Side drain Sloping drain Catch-water drain Cross drain Side drain Sloping drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is availability of funds for the construction project subgrade soil and drainage conditions type and intensity of traffic climatic condition availability of funds for the construction project subgrade soil and drainage conditions type and intensity of traffic climatic condition ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Penetration test on bitumen is used for determining its Temperature susceptibility Grade Ductility Viscosity Temperature susceptibility Grade Ductility Viscosity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tie bars in cement concrete pavements are at warping joints longitudinal joints expansion joints contraction joints warping joints longitudinal joints expansion joints contraction joints ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.04 0.03 0.025 0.02 0.04 0.03 0.025 ANSWER DOWNLOAD EXAMIANS APP