Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 1. 10. un changed. 5. 1. 10. un changed. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching oil. vacuum. air blast. SF6. oil. vacuum. air blast. SF6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a either 1 or 2 AC transmission line None of these DC transmission line either 1 or 2 AC transmission line None of these DC transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draft tube is provided to increase the acting head on the water wheel. None of these raise the water surface of the stream to create an artificial head. reduce the effect of water hammer. increase the acting head on the water wheel. None of these raise the water surface of the stream to create an artificial head. reduce the effect of water hammer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hectograph. Monograph. Hydro-graph. Load duration curve. Hectograph. Monograph. Hydro-graph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 15 MW 80 MW 20 MW 10 MW 15 MW 80 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP