Power Systems Equal area criteria is used for absolute stability of the system either 1 or 2 nether 1 nor 2 relative stability of the system absolute stability of the system either 1 or 2 nether 1 nor 2 relative stability of the system ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 20. 3. 7. 5. 20. 3. 7. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear power plant are used as base load plants. intermediate load plants. peak load plants. none of above. base load plants. intermediate load plants. peak load plants. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following insulator is practically used for railway crossings? strain insulator pin insulator All of these string insulator strain insulator pin insulator All of these string insulator ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 12 MW 10 MW 5 MW 6 MW 12 MW 10 MW 5 MW 6 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase transmission line, each phase is supported by 3 insulated discs, maximum voltage of each disc is 20 kV. Find the operating voltage of the transmission line per phase if efficiency of string is 80.6%. 20 kV 83.76 kV 52.84 kV 48.36 kV 20 kV 83.76 kV 52.84 kV 48.36 kV ANSWER DOWNLOAD EXAMIANS APP