Power Systems Equal area criteria is used for relative stability of the system absolute stability of the system either 1 or 2 nether 1 nor 2 relative stability of the system absolute stability of the system either 1 or 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Coal handling plant. Generator. Turbine. Ash handling plant. Coal handling plant. Generator. Turbine. Ash handling plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is 1 0 greater than 1 less than 1 1 0 greater than 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.99. 0.75. 1.35. 1.0. 0.99. 0.75. 1.35. 1.0. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The inertia constant of 100 MVA, 50 Hz, 4 pole generator is 10 MJ/MVA. If the mechanical input to the machine is suddenly raised from 50 MW to 75 MW, the rotor acceleration will be equal to 12.5 electrical degrees/s² 125 electrical degrees/s² 225 electrical degrees/s² 22.5 electrical degrees/s² 12.5 electrical degrees/s² 125 electrical degrees/s² 225 electrical degrees/s² 22.5 electrical degrees/s² ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Thermal. Gas-turbine. Nuclear. Hydro Power Plant Thermal. Gas-turbine. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP