Power Systems Demand factor of a plant is 0 less than 1 greater than 1 1 0 less than 1 greater than 1 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Steam turbine. Super heater. Boiler. Condenser. Steam turbine. Super heater. Boiler. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase, 110 kV coaxial XLPE insulated power cable delivering power at 50 Hz, has a capacitance of 125 nF/km. If the dielectric loss tangent of XLPE is 2*10^-4, then dielcetric power loss in this cable in W/km/phase is 38.6 31.7 23.9 35.45 38.6 31.7 23.9 35.45 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power stations is mainly used to cover peak load on the system? nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ratio of reset to pick up current for an induction cup relay is approximately 0.99. 1.0. 0.75. 1.35. 0.99. 1.0. 0.75. 1.35. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deaerative heating is done to remove dissolved. heat the feed water. heat the steam. remove dissolved gases in water. remove dissolved. heat the feed water. heat the steam. remove dissolved gases in water. ANSWER DOWNLOAD EXAMIANS APP