Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Condenser. Boiler. Steam turbine. Super heater. Condenser. Boiler. Steam turbine. Super heater. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a lossy transmission line, the characteristic impedance does not depend on The load terminating the line. The operating frequency of the line. The conductivity of conductors. The permittivity of the dielectric separating the conductor. The load terminating the line. The operating frequency of the line. The conductivity of conductors. The permittivity of the dielectric separating the conductor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? 0.56 -0.56 -0.92 0.92 0.56 -0.56 -0.92 0.92 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a steam power plant, the feed water coming to the economizer is heated plant the feed water coming to the economizer is heated using flue gas. direct heat in the furnace. HP steam. LP steam. flue gas. direct heat in the furnace. HP steam. LP steam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power level of nuclear reactor can be increase by ( K = multiplication factor ) raising the value of K above 1 and keeping it at raised value. lowering the value of K below 1 but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. lowering the value of K below 1 but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1, but later bringing it back to K = 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 800 MW 400 MW 200 MW 1600 MW 800 MW 400 MW 200 MW 1600 MW ANSWER DOWNLOAD EXAMIANS APP