Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Super heater. Steam turbine. Boiler. Condenser. Super heater. Steam turbine. Boiler. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 12.2 kV / μs. 9.01 kV / μs. 10.01 kV / μs. 2.0 kV / μs. 12.2 kV / μs. 9.01 kV / μs. 10.01 kV / μs. 2.0 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called settling time. stopping time. damping time. coasting time. settling time. stopping time. damping time. coasting time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of moderator in a nuclear reactor is to reduce temperature. reduce the speed of neutrons. absorb neutrons. stop chain reaction. reduce temperature. reduce the speed of neutrons. absorb neutrons. stop chain reaction. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Inductance of transmission line will decrease when GMD decrease and GMR increase both GMD and GMR increase both GMD and GMR decrease GMD increase and GMR decrease GMD decrease and GMR increase both GMD and GMR increase both GMD and GMR decrease GMD increase and GMR decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to binary vapor cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. binary vapor cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. regenerative cycle. ANSWER DOWNLOAD EXAMIANS APP