Power Systems In a thermal power plant, which of its following components needs maximum maintenance attention Steam turbine. Condenser. Super heater. Boiler. Steam turbine. Condenser. Super heater. Boiler. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is both 1 and 3 IR0 × Xn 3×IR0 × Xn IN × Xn both 1 and 3 IR0 × Xn 3×IR0 × Xn IN × Xn ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are pumped storage plant diesel plant both 1 and 2 nuclear plants pumped storage plant diesel plant both 1 and 2 nuclear plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3000 kW 7500 kW 3750 kW 6000 kW 3000 kW 7500 kW 3750 kW 6000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The most suitable circuit breaker for short line fault without switching resistor is air blast circuit breaker. SF6 breaker. none of these. oil circuit breaker. air blast circuit breaker. SF6 breaker. none of these. oil circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the line capacitance increases remains unaffected None of these decreases increases remains unaffected None of these decreases ANSWER DOWNLOAD EXAMIANS APP