Peak load power plants is/are

 both 1 and 2
 nuclear plants
 diesel plant
 pumped storage plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
For flat voltage profile system, voltage regulation is

 any of the above
 100%
 50%
 0%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load current in short circuit calculations are neglected because

 nether 1 nor 2
 both 1 and 2
 short circuit currents are much larger than load currents
 short circuit currents are greatly out of phase with load currents

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called

  stopping time.
  coasting time.
  damping time.
  settling time.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be

 6.5 MW
 8.5 MW
 4.5 MW
 5.5 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The method of neutral grounding affects the

 zero sequence network
 negative sequence network
 positive sequence network
All of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑