Power Systems The load current in short circuit calculations are neglected because short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents both 1 and 2 nether 1 nor 2 short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents both 1 and 2 nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 900 250 450 500 900 250 450 500 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Out of the following plant categories which is not the base load power plant? Diesel. Run of river. Pump storage. Nuclear. Diesel. Run of river. Pump storage. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is an impulse turbine Pelton turbine. Kaplan turbine. None of above. Francis turbine. Pelton turbine. Kaplan turbine. None of above. Francis turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relays is/are unit protection relays? Differential relays both 1 and 2 over current relays Buccholz relays Differential relays both 1 and 2 over current relays Buccholz relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems String chart is drawn between both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis nether 1 nor 2 T on Y-axis and S and T on on X-axis both 1 and 2 temperature (T) on X- axis, sag(S) and tension (T) on Y-axis nether 1 nor 2 T on Y-axis and S and T on on X-axis ANSWER DOWNLOAD EXAMIANS APP