Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called stopping time. damping time. settling time. coasting time. stopping time. damping time. settling time. coasting time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW 10 MW 12 MW 5 MW 6 MW 10 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Characteristics of arc quenching medium is/are Non flammable High dielectric strength High thermal conductivity All of these Non flammable High dielectric strength High thermal conductivity All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Normally Z bus matrix is a full matrix null matrix sparse matrix unit matrix full matrix null matrix sparse matrix unit matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power level of nuclear reactor can be increase by ( K = multiplication factor ) lowering the value of K below 1 but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. lowering the value of K below 1 but later bringing it back to K = 1. lowering the value of K below and keeping at that lowered value. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Calorific value of solid fuel is expressed as Cal / lt. Cal / gm. KCal / gm. KCal / lt. Cal / lt. Cal / gm. KCal / gm. KCal / lt. ANSWER DOWNLOAD EXAMIANS APP