Power Systems The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called coasting time. damping time. stopping time. settling time. coasting time. damping time. stopping time. settling time. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 50 buses in which 10 are the voltage control buses, 6 are the generator buses. Find the size of the Jacobian matrix? 84*84 83*83 33*33 34*34 84*84 83*83 33*33 34*34 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transformer is used in sub station for operating a protective relay? auto transformer capacitor voltage transformer distribution transformer All of these auto transformer capacitor voltage transformer distribution transformer All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase, 5 kV, 5 MVA system, what is the base impedance? 5 ohms 500 ohms 50 ohms 0.5 ohm 5 ohms 500 ohms 50 ohms 0.5 ohm ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt capacitor at receiving end All of these shunt reactor at receiving end shunt resistance at receiving end shunt capacitor at receiving end All of these shunt reactor at receiving end shunt resistance at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems One fission of U235 releases energy of 525 MeV. 200 MeV. 335 MeV. 435 MeV. 525 MeV. 200 MeV. 335 MeV. 435 MeV. ANSWER DOWNLOAD EXAMIANS APP