Power Systems Communications lines are treated as short transmission lines medium transmission lines any of the above long transmission lines short transmission lines medium transmission lines any of the above long transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems The corona loss on a particular system at 60 Hz is 1 kW/km per phase. What is the corona loss at 50 Hz in kW/km per phase? 1.13 0.882 1 0.93 1.13 0.882 1 0.93 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. pressure inside the turbine casing remains. operating head is controlled. firm capacity of plant is increased. kinetic energy of the running water is fully utilized. pressure inside the turbine casing remains. operating head is controlled. firm capacity of plant is increased. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 - Φ, 33 kV oil circuit breaker is rated 1200 A, 2000 MVA, 3 s. The symmetrical breaking current is 35 kA. 104.8 kA. 1200 A. 3600 A. 35 kA. 104.8 kA. 1200 A. 3600 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In what from the initial energy will be released for the 200 MeV per fission by a neutron in a slow thermal nuclear reactor heat energy. electromagnetic radiations. kinetic energy and sound energy. kinetic energy of particles and electromagnetic radiation. heat energy. electromagnetic radiations. kinetic energy and sound energy. kinetic energy of particles and electromagnetic radiation. ANSWER DOWNLOAD EXAMIANS APP