Power Systems

Power Systems
Length of short transmission line is up to

 any of the above
 150 km
 80 km
 40 km

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is/are advantages of N-R method?

 Time taken for each iteration is less
 both 1 and 2
 Applicable for large power system network
 Number of iterations are less

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Find the number of insulator discs required in string insulator, if operating voltage is 220 kV and maximum voltage of each disc is 11 kV?

 21
 13
 20
 10

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Pumped storage plant is a

 both 1 and 2
 peak load plant
None of these
 base load plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The function of moderator in a nuclear reactor is to

  reduce the speed of neutrons.
 absorb neutrons.
  stop chain reaction.
 reduce temperature.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The unit protection scheme provides

  primary protection.
 remote protection.
 simultaneous protection.
 back up protection.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑