Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3000 kW 3750 kW 7500 kW 6000 kW 3000 kW 3750 kW 7500 kW 6000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems One atomic mass unit is equivalent to 251.2 MeV. 120.4 MeV. 931.4 MeV. 180.5 MeV. 251.2 MeV. 120.4 MeV. 931.4 MeV. 180.5 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 15.9 H 2 H 15.9 mH 2 mH 15.9 H 2 H 15.9 mH 2 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems In relay coil which is used? Instrument transformer. Potential transformer. Power transformer. Current transformer. Instrument transformer. Potential transformer. Power transformer. Current transformer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is any of the above zero less larger any of the above zero less larger ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Hydro electric power plant. Gas turbine plant. Nuclear power plant. Thermal power plant. Hydro electric power plant. Gas turbine plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP